Home
 
  Our Company  
  Design Options  
  Customer Info  
    The Process  
    FAQs  
    Getting Started  
  Residential  
  Commercial  
 


 

 

Before Templating
The following information must be provided before a template date can be assigned:

  • Sink brand and model number.

  • Range brand and model number.

  • Cook-top brand and model number.

  • Faucet brand and model number.

  • Brand and model number for any other appliance that is being used that would require a penetration of the countertop.

Templating
After the cabinetry is installed, we will template for your countertops. If you are only replacing the countertops and not the cabinetry, we may have to remove the backsplash and bar top. This is to ensure an accurate fit of the new countertop.

The area of template must be clear of any objects such as dishes, tools, appliances, etc.

It is the responsibility of the contractor/homeowner to ensure that all cabinetry and end panels are completely installed and secure. It is critical that the cabinets are flat and level so as to eliminate any stress on the countertops.

Installation
Tops must be removed prior to installation crew's arrival. If we are removing the existing tops, we will remove on the day of installation. Plumbing must be disconnected prior to our crew's arrival.

Our installers are moving very heavy countertops. For the safety of everyone involved, homeowners and children should stay away from the work area and an unobstructed access point should be provided. Please be sure all pets are secured during the countertop installation.

After installation, we will clean the countertop area and leave the site in a “broom swept” condition. Installation of countertops is a construction process and residual dust should be expected. We use the most advanced tools for dust collection and we take every precaution to minimize the dust, however the process is not 100% dust free.

 

Surface Crafters

1 (800) 226-7178  
info@surface-crafters.com